Yes. The SKF modules build on each other: you start by consolidating lubrication points via distributor blocks to a single accessible point, later connect a pump and controller to it, and then grow into a sectional or connected system. Euroquip typically suggests starting with the section that has the highest downtime cost, and plans the actual connection within a scheduled stop.


Leave A Comment